Projects

 

 

  • Garuda Indonesia - Jakarta – carried out 2 D Check on DC10, Lead Fitter on tail plane modifications working with McDonnell Design Team

 

  • Cranfield Institute of Technology - Conversion of Hawker 748 to Water Bomber role consisting of details sheet metal work, working from drawings and in conjunction with design department

 

  • Schreiner Aircraft Maintenance - Libya – field maintenance/smw repairs/modifications on oilfield fleet Dash 8 and Twin Otter and Fokker 50/70

 

  • FLS - Stansted – carried out wing root modifications and strengthening on United Airlines 727 Fleet

 

  • Marshalls – RAF Lyneham – C130 Hercules installed ‘Hot Spot’ modifications anti heat seeking missile systems

 

  • Eastern Airlines - Miami Florida - carried out D Check maintenance on Airbus A300 fleet

 

  • 1992 - 1993                 Shorts Belfast

       Production of Fokker 100 wings

 

  • 1991 – 1992                BAe Hatfield

      Aircraft Production BAe 146, installation of flight deck infrastructure, working from                  drawings and under direction from design dept

 

  • Sogema – Bordeaux - Lead Fitter carrying out D Checks and heavy sheet metal repairs on fleet Airbus A330 and A300

 

  • McDonnell Douglas – New York – Carried out major structural repair on MD83, the aircraft had left the runway during thunderstorm and creased fuselage adjacent between seat rows 12 and 14.